SFU – CEP Gas Plant
All-Pro Energy Services supplied and installed the equipment for the primary and secondary piping to the natural gas and biomass boilers at BMDEUP, which feeds SFU’s campus and UniverCity with low-carbon energy for domestic hot water and heating. In this final project to meet SFU’s carbon emission reduction obligation targets, we provided and installed the equipment and piping. In a previous stage waste reduction strategy, we installed Thermogenics boilers into a Temporary Energy Centre (TEC). These boilers from the TEC were then repurposed into the new BMDEUP.